Where is typically the raw flow rate is being normalized before it is converted into EGU (if at all)? In Enterprise SCADA or at the PLC/RTU level?
Where is typically the raw flow rate is being normalized before it is converted into EGU (if at all)? In Enterprise SCADA or at the PLC/RTU level?
PLC/RTU end because instrument connect at Controller
PLC/RTU end because instrument connect at Controller
Thank you Rahul.