I'm trying to use event frames to calculate some performance KPIs within a shift or crew-based time context. We have 4 rotating 12-hr shifts that we can track through an existing PI tag. Is there a way I can use explicit trigger instead of a step continuous event frame to start/end? There's some output expression functionality that I want to use.
Thanks,
Paolo